Industrial and commercial construction
Commercial Builder
Restaurant dining room with exposed brickwork, pendant lights and upholstered chairs

Industrial and commercial construction

Restaurant Fit Out

A restaurant fit out brings together the kitchen, customer areas, building services and interior finishes. We carry out the work needed to prepare new or existing premises for opening day.

Planning the kitchen and dining areas

Kitchen design depends on the type of food prepared, the equipment required and the number of meals served. Deliveries, chilled storage, preparation areas, cooking equipment and the service pass need sufficient space without obstructing staff movement. The dining area must accommodate tables, circulation, toilets and step-free access. Poorly positioned equipment or narrow passages between the kitchen and dining room can create difficulties throughout service.

Rolled architectural drawings over floor plans and technical layouts

Kitchen ventilation, drainage and building services

Commercial kitchen equipment places considerable demands on ventilation, drainage and electrical or gas supplies. Extraction ductwork needs a suitable run and discharge position, with fire safety, odour and noise considered in the design. Planning permission or landlord consent may be needed for external ductwork and plant. Drainage arrangements must deal with food waste and fats, oils and grease, while equipment loads and connections influence the floor construction and service positions.

Working with existing restaurant premises

Refurbishing an existing restaurant, fitting out an empty shell and converting a property from another use are very different jobs. Existing services, landlord restrictions, access and the space available for ductwork and plant all matter. A unit that was previously a shop may need new drainage, a larger gas or electrical supply and an extract duct taken up through the building.

Finishes, equipment installation and opening dates

Finishing work includes joinery, wall and floor finishes, lighting and the installation of kitchen and dining equipment. Materials and fitting details need to be compatible with cleaning, wear and the conditions in each area. Before opening, the relevant building services and kitchen systems must be tested and commissioned. Equipment delivery dates, outstanding approvals and access to the premises can all affect when the restaurant is ready for use.

Pale classical building façade against a blue sky in London

Restaurant fit out specification

Item What it affects
Operation Kitchen layout, covers, service and storage
Equipment Dimensions, loads and specialist installers
Building Existing services, duct runs and landlord requirements
Interior Joinery, finishes, lighting and furniture

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Common questions

Frequently asked questions

Can the fit out include commercial kitchen work?

Yes. Commercial kitchen work can be part of the restaurant fit out, including equipment positions, building alterations and service connections, with specialist supply and installation responsibilities agreed early.

What if the premises were not previously a restaurant?

Converting a shop, office or other commercial unit into a restaurant may involve substantial alterations. Extraction duct runs, drainage capacity, electrical supply, fire safety and toilet provision can determine whether the premises are suitable. The proposed restaurant use may also require planning permission, depending on the property's existing lawful use and the nature of the operation.

Commercial Builder

Discuss your project with us

0330 350 3675

Request a quote

Complete the form and we will get back to you.

Project PlannerRequest a quote