
Industrial and commercial construction
Hotel Refurbishment
Hotel refurbishment covers bedrooms, bathrooms, reception, public spaces and staff areas. In an operating hotel, construction work has to be arranged around guest access, rooms taken out of service and events already booked. Some areas may need to close temporarily while noisy or disruptive work is carried out.
Bedroom refurbishment and room specifications
Bedroom refurbishment ranges from replacing finishes and furniture to stripping out bathrooms, renewing services and altering room layouts. Standard rooms, accessible bedrooms and suites may need different fittings and construction details. A sample room can establish the agreed quality of finishes, joinery, bathroom fittings and workmanship before the same details are repeated across other rooms.

Reception, dining and back-of-house refurbishment
Reception, dining rooms, meeting spaces and staff areas have different requirements for access, finishes and building services. Refurbishment in one area can affect neighbouring rooms through noise, dust and temporary closures. Deliveries and material storage must be managed around guest movement, with separate access used where the building allows it.
Refurbishing a hotel while it remains open
In an open hotel, the number of rooms released at a time and the order in which floors are tackled shape the whole job. Occupancy commitments, weddings, conferences and seasonal peaks decide when larger areas can close. Each phase is planned around the date those rooms must be back on sale.
Furniture installation and room handover
Furniture, bedroom equipment and in-room technology may be installed after the main building work. Fixing positions, power supplies and access must be ready for those installations. Before a room returns to use, affected services and safety provisions need checking, and the room must be finished and cleaned. Bedrooms are commonly returned in groups so completed areas can be separated from work continuing elsewhere.

Main considerations in a hotel refurbishment
| Item | What it affects |
|---|---|
| Bedrooms | Room types, bathroom layouts and the sample room specification |
| Public areas | Reception, dining, circulation and meeting rooms |
| Trading | Rooms released, event dates and areas kept open |
| Completion | Furniture installation and the dates rooms return to sale |
Related refurbishment and fit out services
Plan your project
Commercial Project Planner
Indicative commercial building costs
Common questions
Frequently asked questions
Can bedrooms be refurbished in batches?
Yes. Most hotel bedroom refurbishments run in batches, a floor or part of a floor at a time. The batch size is set by how many rooms the hotel can take out of service and the date each group must return.
Does furniture affect the building work if we buy it ourselves?
Yes, even when it is bought separately. Its dimensions, fixing points and delivery dates affect finishes, access through the building and the order in which rooms are handed back.
Request a quote
Complete the form and we will get back to you.