Industrial and commercial construction
Factory Construction
Factory construction is shaped by the production process. We build new factories and replacement facilities, and carry out the building work that goes with a change in manufacturing capacity.
Factory layout and the production sequence
Factory layouts depend on how materials, products and people move through the operation. Some production lines follow a continuous sequence, while others use separate work cells or equipment shared between processes. Machinery positions affect structural spans, floor loads and service distribution. Maintenance access, safe movement around equipment and space for future replacement are also important.

Machinery requirements and building design
Machine loads, foundations, pits, openings and service connections affect the structural design. Large presses, rotating machinery and other heavy equipment may need reinforced or isolated foundations. Final equipment dimensions and load information are particularly important before concrete work, because later changes to bases or openings can be costly and disruptive.
Utilities and internal environment
A factory may need a large electrical supply, water, drainage, ventilation, compressed air or other process services. Supply upgrades from the network operator can take a long time to arrange, so the required capacity is worked out alongside the equipment list. The contract makes clear which installations are ours and which sit with specialist suppliers or the production team.
Relocation and commissioning
Moving production into a new factory can involve several stages of machinery removal, transport, installation and testing. The building may need to be sufficiently complete for equipment installation before other areas are finished. Where production continues at the original premises, machinery can only be taken out of service during suitable shutdown periods. Heavy equipment may also require lifting access before external walls or roof sections are completed.

Factory construction design considerations
| Item | What it affects |
|---|---|
| Production | Process sequence and equipment schedule |
| Building | Structural grid, working height and maintenance space |
| Utilities | Demand, incoming capacity and distribution |
| Changeover | Installation, testing and transfer of operations |
Factory buildings, industrial units and groundworks
Plan your project
Commercial Project Planner
Indicative commercial building costs
Common questions
Frequently asked questions
Should machinery be selected before the factory is designed?
Not always, but the design needs enough equipment information to set loads, dimensions, connections and maintenance access. Where selection is incomplete, we design to agreed assumptions and fix a date by which the final details must arrive.
Can the building work include moving our production?
The building work can be arranged around a machinery move, including new foundations, equipment access openings and service alterations. Machinery transport, installation and commissioning may be undertaken by specialist contractors. Where the existing factory remains operational, the timing of construction work can be critical to maintaining production.