Industrial and commercial construction
Commercial Builder
Glass office façades viewed from below in London

Industrial and commercial construction

Commercial Building Services

Commercial and industrial building work, including new premises, extensions, refurbishment, structural alterations and fit out.

Commercial Construction

New commercial buildings, extensions and major refurbishments for businesses, landlords and developers, built to suit the business that will use the space.

View details

Industrial Construction

New industrial buildings, extra operational space and substantial alterations, designed around production, storage and the movement of goods.

View details

Warehouse Construction

New warehouses for storage and distribution, with the racking layout, handling equipment, loading docks and yard designed alongside the building itself.

View details

Factory Construction

New factories, replacement facilities and building work for a change in manufacturing capacity, designed around the production process.

View details

Commercial Design and Build

Commercial design and build, with design development and construction under one contract, for new premises and substantial building projects.

View details

Commercial Building Extensions

Commercial extensions for additional business space, with structural connections, building services and access considered alongside the existing premises.

View details

Industrial Unit Construction

Industrial unit construction for owner occupiers, landlords and developers, from single shell units to fitted multi-unit schemes.

View details

Steel Frame Buildings

Complete steel frame buildings for industrial and commercial use, including foundations, cladding, roofing and services.

View details

Warehouse Extensions

Warehouse extensions for extra storage, picking, packing or loading capacity, built to connect with the existing operation and yard.

View details

Commercial Refurbishment

Refurbishment of existing commercial premises for a new layout, a better specification or a change of use.

View details

Warehouse Refurbishment

Warehouse refurbishment for new occupiers, changed storage operations and buildings that need substantial improvement to the shell, services and offices.

View details

Office Refurbishment

Office refurbishment for changing workplaces, lease events and existing offices that need a better layout, services and finishes for the people using them.

View details

Office Fit Out

Office fit out for new premises, expansion and workplace changes, from shell or CAT A space to a finished office.

View details

Commercial Fit Out

Commercial fit out for offices, shops, restaurants and operational premises.

View details

Commercial Groundworks

Commercial groundworks: site preparation, foundations, drainage, services and hard surfaces.

View details

Commercial Structural Alterations

Structural alterations to commercial premises, from new openings and layout changes to adapting a building for a different operation.

View details

Industrial Refurbishment

Industrial refurbishment can extend the useful life of an existing building or adapt it for different machinery and production requirements. The condition of the structure, roof, floors and services determines how much of the building can remain.

View details

Factory Extensions

Factory extensions for additional production or storage space, including structural connections, floor levels, machinery access and alterations to existing services.

View details

New buildings

Commercial Construction

Commercial construction includes new premises, extensions and substantial alterations to existing buildings. Vehicle access, working areas, structural requirements and building services all affect the finished property.

Industrial Construction

Industrial premises must accommodate machinery, materials, storage and safe movement through the building. Production requirements can affect floor loading, clear heights, power supplies and the arrangement of internal space.

Warehouse Construction

Warehouse design depends heavily on goods movement. Loading bay positions, yard depth, racking heights and forklift aisles can all affect the size and arrangement of the building.

Factory Construction

Factory construction must account for the machinery and production processes housed within the building. Floor loads, electrical capacity, ventilation, maintenance access and future equipment changes can have a substantial effect on the design.

Industrial Unit Construction

Industrial units can be built for a known occupier or for future letting. The intended use affects unit dimensions, service connections, access arrangements and whether the building is handed over as a shell or with internal accommodation.

Steel Frame Buildings

Steel frames provide open internal space for many commercial and industrial buildings. Column positions, spans, roof loads and foundation design must suit the intended use, while the cladding and building services have to work with the structural arrangement.

Steel roof trusses and yellow overhead equipment inside an industrial hall

Extensions and refurbishment

Commercial Building Extensions

Extending an occupied commercial building can be more complicated than constructing a separate structure. Connections to existing foundations, roofs and services need careful detailing, particularly where the business remains open during construction.

Warehouse Extensions

Warehouse extensions must work with the existing loading operation and internal handling arrangements. Yard access, racking positions, fire safety and the connection between the new and existing structures can limit how the additional space is arranged.

Commercial Refurbishment

Refurbishment brings existing commercial premises up to date for a new layout, a better specification or a change of use. The work can involve structural alterations, new building services and internal finishes.

Warehouse Refurbishment

Warehouse refurbishment can involve replacing damaged cladding, repairing roofs, altering loading bays or renewing building services. Existing floor condition, clear height and fire safety arrangements may also limit how the building can be reused.

Office Refurbishment

Office refurbishment may involve removing partitions, changing the ventilation and electrical installations, renewing washrooms or replacing worn finishes. Work in occupied offices also needs to account for noise, dust and access.

Industrial Refurbishment

Industrial refurbishment often means adapting an existing structure for different machinery or heavier use. The condition of floors, frames, roofs and services needs to be understood before substantial alterations are made.

Factory Extensions

Factory extensions may need to connect directly to production lines or provide separate areas for machinery and materials. Structural connections, service capacity and construction beside operating equipment can all affect the work.

Fit out, groundworks and design and build

Office Fit Out

Office fit out commonly involves partitions, ceilings, lighting, ventilation, power and data installations, together with internal finishes. Existing services and the condition of the space affect what can be retained and what must be replaced.

Commercial Fit Out

Commercial fit out converts a building shell or existing premises into usable business accommodation. Internal partitions, building services, fire safety arrangements and finishes must suit the intended occupation.

Commercial Groundworks

Commercial groundworks are the site preparation and below-ground construction for a building or development. The work can include excavation, foundations, drainage and external hardstanding. Mistakes here are costly to correct.

Commercial Structural Alterations

Commercial structural alterations can involve new openings, removing loadbearing walls, strengthening floors or modifying an existing frame. The original structure must be investigated and assessed by a competent structural engineer before loadbearing changes are made.

Commercial Design and Build

Under a design and build contract, one contractor takes contractual responsibility for both design and construction, subject to the agreed terms. The contractor may develop an initial design or take responsibility for completing a design already partly prepared.

Planning a building project

Many projects involve more than one of the services above, and we cover them all. The commercial project planner is a simple way to put early budget figures alongside an outline of the work.

Contact Commercial Builder.

Office workstations beneath recessed ceiling lights

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Commercial Builder

Discuss your project with us

0330 350 3675

Request a quote

Complete the form and we will get back to you.

Project PlannerRequest a quote