New buildings, extensions and refurbishments
A new building on a clear site gives the most freedom over layout, but it depends on ground conditions, drainage and new utility connections. An extension has to tie into an existing structure, roof and services. A refurbishment works within the building that is already there, and its condition is not always what the drawings suggest.
Work on an existing building can reveal alterations that were never recorded. The condition of the frame, foundations, roof and incoming services may need further investigation, particularly where new loads or openings are proposed. Opening up selected areas can reveal hidden defects and help establish what the retained structure can safely support.