Industrial and commercial construction
Commercial Builder
Rolled architectural drawings over floor plans and technical layouts

Industrial and commercial construction

Commercial Project Planner

A commercial building cost calculator using entered floor area, construction rates, additional allowances and contingency to calculate an indicative budget.

Building use, size and site

Building use, floor area and site conditions are central to an early construction budget. Restricted access, existing occupation, abnormal ground conditions and specialist equipment can all affect the cost. The planner keeps these details alongside the calculated figures.

Glass office façades viewed from below in London

How the cost calculator works

The commercial building cost calculator multiplies the entered floor area by the entered construction rate. Additional allowances are added to that figure, and the selected contingency percentage is applied to the combined subtotal. It does not supply construction rates or independently estimate market prices.

What a construction rate includes

Construction rates are not always directly comparable. One may cover the building shell alone, while another includes services, internal finishes or external work. These costs should not be added again as separate allowances if they are already included in the entered rate.

Discuss your commercial building project

Early budgets need to allow for significant uncertainty, especially before ground conditions and design requirements are established. More detail is available in our guides to commercial construction cost and preparing a construction tender.

Discuss your commercial building project.

Meeting room with a table, projection screen and tall windows

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Common questions

Frequently asked questions

Do I have to enter a construction rate?

No. The construction rate can be left blank until a suitable figure is available from an estimate, cost plan or contractor quotation. Without a rate, the calculator cannot calculate the main floor-area-based construction cost.

What does the contingency percentage apply to?

It applies to the main works figure (floor area multiplied by rate) plus any additional allowances you enter. The result shows the base subtotal and the contingency separately.

Commercial Builder

Discuss your project with us

0330 350 3675

Request a quote

Complete the form and we will get back to you.

Project PlannerRequest a quote