Industrial and commercial construction

Commercial Refurbishment

Commercial refurbishment of existing premises can involve altered layouts, replacement building services, repairs and new finishes. Work to accommodate a different use may also require changes to access, fire safety and other building elements.

What stays and what changes

The condition of the existing building determines how much can be retained. Sound partitions, services and fittings may remain, while damaged or unsuitable elements need replacing. Older drawings are often incomplete, and concealed defects can remain unknown until ceilings, floors or wall finishes are opened up. These findings can change the extent of the building work.

Open-plan office with desks, reception counter and lounge seating

Work behind the visible finishes

New finishes often depend on work behind walls, above ceilings or below floors. Altering a room layout can mean moving ventilation, lighting, electrical distribution and fire protection. A property may appear to need only redecoration, but older services or structural defects can make the work considerably more involved. The condition of the concealed building fabric matters as much as the visible finish.

Refurbishing occupied or vacant premises

A vacant property, a partly occupied one and a building that trades throughout each need a different approach. Occupation decides which work areas are available, how deliveries reach them and the order of the job. Temporary accommodation, furniture moves and tenant installations often have to be planned alongside the building work.

Comparing commercial refurbishment prices

Refurbishment prices can vary substantially where existing-building conditions are uncertain. Marked-up drawings, room schedules and finishes specifications help distinguish the agreed work from items that may change after opening-up. Structural alterations, replacement services and repairs to hidden defects need particular attention because they can account for a large part of the final cost.

Red brick factory façade with tall windows in England

Commercial refurbishment costs

Item What it affects
Condition Surveys, defects and elements to be kept
Layout Partitions, access and structural changes
Services Heating, ventilation, power and lighting
Finishes Room-by-room specification and fit out

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Common questions

Frequently asked questions

How do you price the refurbishment of an older building?

Measured work such as partition alterations, replacement doors and specified finishes can normally be priced from drawings and surveys. Concealed structure, defective services and hidden damage are less certain. Opening-up work can reduce that uncertainty, but some defects may only become apparent during construction and require separate costing.

Is refurbishment the same as fit out?

Not quite, although the two overlap. Refurbishment can include work to the existing structure, envelope and services, while fit out prepares the internal space for its intended use. Many projects involve both.