Commercial Building Feasibility

A commercial building may have enough floor area but still be unsuitable for the intended use. Structural capacity, access, services, planning restrictions and the condition of the existing property can all limit what can be done. These matters influence whether extension, refurbishment or replacement is worthwhile.

Building requirements and available space

A business may need more production space, extra storage, better access or a building that suits a different way of working. Depending on the property, the answer might be to extend, refurbish, rebuild or relocate. Each option has to be weighed against what the business needs, the space available and the limits of the site.

Converted dock buildings beside the River Avon in Bristol

The site and the existing building

Site plans, surveys, lease terms, planning history and existing drawings show what is already known. Gaps should stay visible as gaps rather than be treated as confirmed. A measured survey, a test of electrical capacity or a condition survey can change the answer completely.

Planning permission and building regulations

In England, planning permission and Building Regulations approval are separate processes. The proposed use, the location and the building work decide which apply, and a scheme can need one, both or neither. The government guidance below explains the English arrangements. Scotland, Wales and Northern Ireland have their own planning and building control systems.

Cost and impact of each option

The cost of extending a building cannot be judged without considering alterations to the existing structure, access and services. Refurbishment may avoid some new construction but can reveal defects once work begins. Relocation brings different costs, including fitting out the replacement premises and moving the operation. These differences matter when comparing the available options.

Meeting room with a table, projection screen and tall windows

Commercial building feasibility considerations

Item What it covers
Objective Capacity, relocation, property use or investment decision
Existing information Site, building, surveys and existing records
Alterations, usable space, construction cost and disruption Layout, extent of work, operational effect and assumptions
Further investigations or design needed to establish whether the work is viable Design work and surveys needed to reach a decision

Official information for England: when planning permission is required and building regulations approval.

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Common questions

Frequently asked questions

Can feasibility be assessed without detailed drawings?

Yes. An initial assessment can use existing plans, property information and the proposed use of the building. The accuracy of the conclusions will depend on what is known about the structure, services and site. Further surveys or design work may be necessary before costs and construction options can be judged with confidence.

Does planning permission also settle building regulations?

No. Planning permission and Building Regulations approval are separate processes, and the requirements for each depend on the work and where the property is.