Moving a restaurant kitchen can change much more than the distance between preparation and service. Cooking equipment needs a workable extraction arrangement, while sinks and other wastewater connections need suitable drainage. Where pipes and ducts can run through the building decides whether a preferred layout will work.
Trace extraction beyond the cooking position
An attractive kitchen plan may show where a canopy belongs without showing the duct run or discharge point. Those connections need space within the building and may pass through areas outside the kitchen itself.
HSE’s catering-kitchen ventilation guidance for Great Britain links system design to the cooking load, equipment, kitchen layout and maintenance requirements. It also addresses replacement air and the building constraints affecting inlets and discharge points.
For a restaurant fit out, provide the proposed menu, equipment schedule and anticipated busy periods alongside the layout. These details help the ventilation designer assess the intended operation, including equipment retained from an existing kitchen.
Allow room for access and coordination
The duct run needs to be assessed alongside the structure and other services. A space visible above a ceiling is not automatically available throughout its length. Beams, existing installations and changes in level can affect the proposal.
Access for cleaning and maintenance needs to remain usable in the completed interior. Ask the design team to show where access is required before ceiling finishes and fixed joinery are agreed. A duct run that fits only before the finishes are installed will not work once the kitchen is fitted out.
The ventilation package must also be coordinated with cooking appliances and their fuel arrangements. For gas-fired equipment, the design needs to address combustion air, flueing and any required gas-supply interlocking with mechanical extraction. Record who is responsible for equipment information, specialist assessments, connections, commissioning and handover before appliances and ceiling works are committed.
Check drainage levels as well as distances
A sink’s distance from an existing connection is only part of the drainage question. Gravity drainage depends on suitable pipe gradients and connection levels. Available floor depth and the position of structural elements can therefore decide which layout works.
For projects in England, Approved Document H provides building-regulations guidance on foul drainage. The designer needs to assess the proposed pipework and connection arrangement against the relevant requirements for the project.
Ask for existing drainage drawings and identify any survey work needed to establish connection levels, pipe runs and condition. Check whether the proposed sink, dishwasher and other wastewater connections can achieve suitable falls within the available floor and service zones. The layout should also allow for required access to inspect and maintain the drainage, rather than assuming an existing outlet can accept every proposed connection.
Use duct and drain runs to compare kitchen layouts
Two layouts with similar preparation space can require very different work behind the finishes. Compare the extract duct run, drainage arrangement, access requirements and any affected areas outside the kitchen before selecting a preferred option.
- Where will extracted air leave and replacement air enter?
- Can the proposed duct and pipe runs be installed and maintained?
- Are drainage connection levels established?
- Which building or equipment details remain unconfirmed?
The resulting brief should show the equipment arrangement, proposed extract and replacement-air duct runs, drainage connection levels and maintenance access. Identify which measurements still need confirmation and the testing and commissioning records expected at handover. This gives the fit-out quotation a defined list of work while keeping the kitchen layout connected to what the building can accommodate.



