Industrial and commercial construction
Commercial Builder
Hotel reception with a curved sofa, brass-toned desk and timber wall panels

Industrial and commercial construction

Hotel Refurbishment

Hotel refurbishment covers bedrooms, bathrooms, reception, public spaces and staff areas. In an operating hotel, construction work has to be arranged around guest access, rooms taken out of service and events already booked. Some areas may need to close temporarily while noisy or disruptive work is carried out.

Bedroom refurbishment and room specifications

Bedroom refurbishment ranges from replacing finishes and furniture to stripping out bathrooms, renewing services and altering room layouts. Standard rooms, accessible bedrooms and suites may need different fittings and construction details. A sample room can establish the agreed quality of finishes, joinery, bathroom fittings and workmanship before the same details are repeated across other rooms.

Pale classical building façade against a blue sky in London

Reception, dining and back-of-house refurbishment

Reception, dining rooms, meeting spaces and staff areas have different requirements for access, finishes and building services. Refurbishment in one area can affect neighbouring rooms through noise, dust and temporary closures. Deliveries and material storage must be managed around guest movement, with separate access used where the building allows it.

Refurbishing a hotel while it remains open

In an open hotel, the number of rooms released at a time and the order in which floors are tackled shape the whole job. Occupancy commitments, weddings, conferences and seasonal peaks decide when larger areas can close. Each phase is planned around the date those rooms must be back on sale.

Furniture installation and room handover

Furniture, bedroom equipment and in-room technology may be installed after the main building work. Fixing positions, power supplies and access must be ready for those installations. Before a room returns to use, affected services and safety provisions need checking, and the room must be finished and cleaned. Bedrooms are commonly returned in groups so completed areas can be separated from work continuing elsewhere.

Restaurant dining room with exposed brickwork, pendant lights and upholstered chairs

Main considerations in a hotel refurbishment

Item What it affects
Bedrooms Room types, bathroom layouts and the sample room specification
Public areas Reception, dining, circulation and meeting rooms
Trading Rooms released, event dates and areas kept open
Completion Furniture installation and the dates rooms return to sale

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Common questions

Frequently asked questions

Can bedrooms be refurbished in batches?

Yes. Most hotel bedroom refurbishments run in batches, a floor or part of a floor at a time. The batch size is set by how many rooms the hotel can take out of service and the date each group must return.

Does furniture affect the building work if we buy it ourselves?

Yes, even when it is bought separately. Its dimensions, fixing points and delivery dates affect finishes, access through the building and the order in which rooms are handed back.

Commercial Builder

Discuss your project with us

0330 350 3675

Request a quote

Complete the form and we will get back to you.

Project PlannerRequest a quote