
Industrial and commercial construction
Terms and Conditions
Commercial Builder operates commercialbuilder.co.uk.
Last updated: 9 October 2026.

1. What these terms cover
These terms cover your use of commercialbuilder.co.uk, the website operated for Commercial Builder. You accept them when you use the site, submit a project request or ask us to put you in touch with a supplier.
2. Who operates Commercial Builder
This website is operated by Commercial Builder. Our contact address is Suite 114b Business First, Davyfield Road, Blackburn, Lancashire BB1 2QY.
Customers use this website to tell Commercial Builder about a construction project, so that we can introduce their request to a supplier or third-party company that may be able to assist.
3. No fee for requests or introductions
There is no cost to the customer for sending a request through this site, and none for being introduced to a supplier. We may receive income from suppliers or third-party companies in the form of commission, referral income, sales income or marketing fees. That commercial arrangement does not add any fee for using the website.

4. What the site provides
The site offers general service information, ways of getting in touch and contact forms. We may look over the details you send and then pass your request on to a third-party contractor, supplier or service provider we believe may suit the work you have described.
Any introduction reflects the information available at that time. We do not guarantee:
- that a supplier will be available;
- that a supplier will take the job on;
- that the job can be finished within any particular timescale;
- that a supplier’s quoted price will meet your expectations.
5. Choosing a supplier
We may use the details you give us to judge which supplier looks like a good fit for the job. That does not mean the supplier is the only one suitable, the cheapest or the best in every circumstance. The decision on whether to instruct a supplier stays with you.
6. Our role: connector, not contractor
Commercial Builder acts as a connector. Unless we agree otherwise in writing, none of the following is done by us: the physical work itself, construction work carried out by us through this website, operating plant or equipment, or attending site as the appointed contractor.
The supplier appointed for the work is responsible for its own:
- quotations and advice;
- insurance, licences and permits;
- risk assessments and method statements;
- staff, vehicles and equipment;
- site attendance and work quality;
- project documentation and aftercare.
Before instructing a supplier, you should check its credentials and its terms.
7. Quotations, timetables and contracts
Unless we expressly state otherwise in writing, the supplier and you are the parties to any estimate, quotation, booking, order, site visit, call-out, supply contract or service contract. You must read the supplier’s own terms and agree them before you authorise any work.
The appointed supplier controls construction timetables, prices, materials, payment schedules, site access requirements, cancellation terms and additional work. If the extent of the work changes once a supplier has reviewed the site, the supplier may revise its quotation or decline the job.
8. Information you must provide
Whenever you contact us or a supplier, you are responsible for making sure the information you give is accurate, complete and current. This includes:
- the extent of the work, drawings and photographs;
- the site address and any access limits;
- height or lifting constraints;
- known conditions on site;
- any deadline that affects the work.
9. Site access, safety and the supplier’s assessment
Once a supplier has been introduced, you must give it the information it needs to assess environmental risk, health and safety, site access and the extent of the job. That may include drawings, planning information, previous survey results, photographs, induction requirements, parking arrangements and any rules specific to the site.
A supplier may refuse to proceed:
- if conditions on site differ from the information provided;
- if there is a safety concern;
- if documentation it requires is missing;
- if the work falls outside its permissions, insurance or competence.
10. Proper use of the website
You must not submit false, misleading, unlawful or abusive information, and you must not share confidential information about a third party without authority. You also must not use the site in a way that interferes with how it operates or that attempts to gain unauthorised access to systems, data or supplier information.
11. General information, not professional advice
Content on this site is general service information. It is not architectural, engineering, legal, health and safety, regulatory, tax or insurance advice. Where the job requires it, you should obtain advice from a competent professional or from the appointed supplier.
We aim for content that is clear and useful. Even so, we make no promise that each page is complete or current, or that it suits every site. Supplier availability, laws, guidance and operational requirements may change.
12. Independent suppliers and problems after instruction
Third-party suppliers are independent businesses, not employees of Commercial Builder. Unless the law says we cannot exclude that responsibility, we are not responsible for a supplier’s acts, omissions, advice, delays, pricing, documentation, staff conduct, work quality, damage, loss or regulatory compliance.
If an issue arises after you have instructed a supplier, raise it with that supplier directly as soon as possible. Investigating and resolving issues connected with its quotation, attendance, work or aftercare is the supplier’s responsibility.
13. Limits of our liability
Where excluding or limiting liability would be unlawful, these terms do not do so. That includes our liability for death or personal injury caused by negligence, and for fraud or fraudulent misrepresentation. Subject to that, our part is limited to running the website and, where appropriate, making introductions.
Subject to those limits and any responsibility we cannot lawfully exclude, we are not responsible for claims, costs, damage, delays, losses or disputes arising between you and a third-party supplier once an introduction has been made. That includes matters about the supplier’s advice, attendance, work, service quality, payment terms or contract terms.
14. Your request details and privacy
When you send a request, we may use what you provide to reply to you and to introduce your project to a suitable supplier. Our Privacy Policy and Cookie Policy give more detail about personal information.
15. Availability of the website
At any time, we may change, update, withdraw or suspend any part of this website. There is no guarantee that the site, its telephone lines, contact forms, email addresses or supplier-matching process will always be available or free from interruption.
16. Intellectual property
The relevant rights holder owns, or holds a licence for, the branding, logos, text, design, page layouts and other materials on this site. Viewing and printing pages for your own internal decision-making is permitted. Without permission, you must not scrape, copy, sell, republish or reuse substantial parts of the site.
17. Updates to these terms
These terms may be updated from time to time. Whenever you use the site, the most recent version published here applies, and by continuing to use the site once changes are published, you accept the revised terms.
18. Governing law and courts
The laws of England and Wales govern these terms, and jurisdiction lies with the courts of England and Wales, unless consumer protection law gives you a mandatory right to bring proceedings in another court.
19. Questions
Email info@commercialbuilder.co.uk or use our contact page with any question about this website or these terms. If the question concerns work a supplier has carried out, contact that supplier directly first, because the supplier controls the quotation, the work and the aftercare.
Plan your project
Commercial Project Planner
Indicative commercial building costs
Request a quote
Complete the form and we will get back to you.