Industrial and commercial construction
Commercial Builder
Rolled architectural drawings over floor plans and technical layouts

Industrial and commercial construction

Cookie Policy

Commercial Builder uses cookies to remember your choices and, if you agree, to understand how visitors use this website.

Your cookie choices

Cookies are small pieces of information stored by your browser. We use necessary cookies and optional analytics cookies. You can browse, use our commercial project planner and contact us without accepting analytics.

Choose Accept all, Reject optional or Choose cookies in the banner. To change your choice later, select Cookie settings in the footer, change the analytics setting and select Save settings. Turning analytics off stops further analytics requests and removes the Google Analytics cookies set by this website.

Meeting room with a table, projection screen and tall windows

The cookie that remembers your choice

pressidium_cookie_consent is a necessary cookie set on commercialbuilder.co.uk. It holds your cookie choices and a consent identifier so the website can apply those choices. It expires after 182 days. You can change your choice before then using Cookie settings.

Optional Google Analytics cookies

If you accept analytics, Google Analytics 4 measures page visits and interactions such as service links, contact clicks and contact form outcomes. Google receives this measurement data. We use a report for this website and a shared report covering our websites.

  • _ga helps distinguish visits using a browser identifier.
  • _ga_4EMGE26GDF maintains session information for this website’s analytics report.
  • _ga_XTNHT3Y0C2 maintains session information for the shared analytics report.

These cookies are set on commercialbuilder.co.uk only after you accept analytics. Their configured expiry is up to two years; your browser may apply a shorter limit. They can be updated as you use the website with analytics enabled. Cookie expiry is separate from how long information is held in analytics reports.

Temporary storage for your project brief

When you choose to carry a brief from our commercial project planner into the contact form, the browser stores it temporarily as lgx_project_brief. This session storage lets the contact page put the brief into your message. It is removed after a successful transfer; otherwise it lasts for that tab session. You can edit the message before sending it.

With analytics enabled, lgx_last_form_submit temporarily holds a form submission event identifier, the selected service and the form used. It supports measurement of the submission outcome and is removed once the successful submission has been measured, or when the tab session ends. It does not store the contact fields or message.

Glass office façades viewed from below in London

Records of cookie choices

Our server keeps a record of your cookie choices, consent identifier, date and time, page address, partially masked IP address, browser information and country where available. Changing your choice updates that record. These records are separate from the cookies on your device.

The contact form also uses checks on our server to reduce spam. These checks do not require analytics consent.

Questions and further information

For questions about cookies on Commercial Builder, email info@commercialbuilder.co.uk or use our contact page. Our privacy policy covers personal information. You can also read the Information Commissioner’s Office guidance on cookie choices and consent.

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Commercial Builder

Discuss your project with us

0330 350 3675

Request a quote

Complete the form and we will get back to you.

Project PlannerRequest a quote