Industrial and commercial construction
Commercial Builder
Illuminated office buildings beside the waterfront at MediaCity

Industrial and commercial construction

About Commercial Builder

Commercial Builder provides information about industrial and commercial construction and helps connect building projects with independent contractors.

Commercial Builder

Contact us

Suite 114b Business First
Davyfield Road
Blackburn, Lancashire BB1 2QY

0330 350 3675
info@commercialbuilder.co.uk

Contact us
Illustrative photograph of an office building

Commercial and industrial construction

Commercial Builder is a website for commercial and industrial construction projects. It covers new buildings, extensions, refurbishment and fit out, helping businesses and property owners connect with independent contractors for the work required.

Meeting room with a table, projection screen and tall windows

The buildings we work on

Industrial buildings can require heavy-duty floors, substantial power supplies and space for machinery. A new warehouse needs suitable loading access, yard space and internal handling arrangements. Commercial interiors have different demands, particularly where customers and staff occupy the same premises. Work to existing premises can uncover concealed defects or services that differ from the available drawings.

What affects construction work

The ground, how far the design has progressed, what the work covers and the dates the business is working to all affect how a project is run. Specialist installations and the intended use of each space decide what goes into the building contract. If the business has to keep operating while work goes on, safe access and keeping existing services live become central to the plan.

Drawings and existing buildings

Existing drawings provide useful information, but they may not show later alterations, concealed construction or the actual condition of the structure. Surveys and further investigation can be necessary before major refurbishment or structural work is designed.

Rolled architectural drawings over floor plans and technical layouts

Contacting Commercial Builder

Commercial Builder can be reached through the contact page. The project planner also provides an indicative calculation using entered construction rates and allowances. The Blackburn postal address and opening hours are listed on the contact page.

Plan your project

Commercial Project Planner

Indicative commercial building costs

Use the planner

Commercial Builder

Discuss your project with us

0330 350 3675

Request a quote

Complete the form and we will get back to you.

Project PlannerRequest a quote