
Industrial and commercial construction
Commercial Building Services
Commercial and industrial building work, including new premises, extensions, refurbishment, structural alterations and fit out.
Commercial Construction
New commercial buildings, extensions and major refurbishments for businesses, landlords and developers, built to suit the business that will use the space.
View detailsIndustrial Construction
New industrial buildings, extra operational space and substantial alterations, designed around production, storage and the movement of goods.
View detailsWarehouse Construction
New warehouses for storage and distribution, with the racking layout, handling equipment, loading docks and yard designed alongside the building itself.
View detailsFactory Construction
New factories, replacement facilities and building work for a change in manufacturing capacity, designed around the production process.
View detailsCommercial Design and Build
Commercial design and build, with design development and construction under one contract, for new premises and substantial building projects.
View detailsCommercial Building Extensions
Commercial extensions for additional business space, with structural connections, building services and access considered alongside the existing premises.
View detailsIndustrial Unit Construction
Industrial unit construction for owner occupiers, landlords and developers, from single shell units to fitted multi-unit schemes.
View detailsSteel Frame Buildings
Complete steel frame buildings for industrial and commercial use, including foundations, cladding, roofing and services.
View detailsWarehouse Extensions
Warehouse extensions for extra storage, picking, packing or loading capacity, built to connect with the existing operation and yard.
View detailsCommercial Refurbishment
Refurbishment of existing commercial premises for a new layout, a better specification or a change of use.
View detailsWarehouse Refurbishment
Warehouse refurbishment for new occupiers, changed storage operations and buildings that need substantial improvement to the shell, services and offices.
View detailsOffice Refurbishment
Office refurbishment for changing workplaces, lease events and existing offices that need a better layout, services and finishes for the people using them.
View detailsOffice Fit Out
Office fit out for new premises, expansion and workplace changes, from shell or CAT A space to a finished office.
View detailsCommercial Fit Out
Commercial fit out for offices, shops, restaurants and operational premises.
View detailsCommercial Groundworks
Commercial groundworks: site preparation, foundations, drainage, services and hard surfaces.
View detailsCommercial Structural Alterations
Structural alterations to commercial premises, from new openings and layout changes to adapting a building for a different operation.
View detailsIndustrial Refurbishment
Industrial refurbishment can extend the useful life of an existing building or adapt it for different machinery and production requirements. The condition of the structure, roof, floors and services determines how much of the building can remain.
View detailsFactory Extensions
Factory extensions for additional production or storage space, including structural connections, floor levels, machinery access and alterations to existing services.
View detailsNew buildings
Commercial Construction
Commercial construction includes new premises, extensions and substantial alterations to existing buildings. Vehicle access, working areas, structural requirements and building services all affect the finished property.
Industrial Construction
Industrial premises must accommodate machinery, materials, storage and safe movement through the building. Production requirements can affect floor loading, clear heights, power supplies and the arrangement of internal space.
Warehouse Construction
Warehouse design depends heavily on goods movement. Loading bay positions, yard depth, racking heights and forklift aisles can all affect the size and arrangement of the building.
Factory Construction
Factory construction must account for the machinery and production processes housed within the building. Floor loads, electrical capacity, ventilation, maintenance access and future equipment changes can have a substantial effect on the design.
Industrial Unit Construction
Industrial units can be built for a known occupier or for future letting. The intended use affects unit dimensions, service connections, access arrangements and whether the building is handed over as a shell or with internal accommodation.
Steel Frame Buildings
Steel frames provide open internal space for many commercial and industrial buildings. Column positions, spans, roof loads and foundation design must suit the intended use, while the cladding and building services have to work with the structural arrangement.

Extensions and refurbishment
Commercial Building Extensions
Extending an occupied commercial building can be more complicated than constructing a separate structure. Connections to existing foundations, roofs and services need careful detailing, particularly where the business remains open during construction.
Warehouse Extensions
Warehouse extensions must work with the existing loading operation and internal handling arrangements. Yard access, racking positions, fire safety and the connection between the new and existing structures can limit how the additional space is arranged.
Commercial Refurbishment
Refurbishment brings existing commercial premises up to date for a new layout, a better specification or a change of use. The work can involve structural alterations, new building services and internal finishes.
Warehouse Refurbishment
Warehouse refurbishment can involve replacing damaged cladding, repairing roofs, altering loading bays or renewing building services. Existing floor condition, clear height and fire safety arrangements may also limit how the building can be reused.
Office Refurbishment
Office refurbishment may involve removing partitions, changing the ventilation and electrical installations, renewing washrooms or replacing worn finishes. Work in occupied offices also needs to account for noise, dust and access.
Industrial Refurbishment
Industrial refurbishment often means adapting an existing structure for different machinery or heavier use. The condition of floors, frames, roofs and services needs to be understood before substantial alterations are made.
Factory Extensions
Factory extensions may need to connect directly to production lines or provide separate areas for machinery and materials. Structural connections, service capacity and construction beside operating equipment can all affect the work.
Fit out, groundworks and design and build
Office Fit Out
Office fit out commonly involves partitions, ceilings, lighting, ventilation, power and data installations, together with internal finishes. Existing services and the condition of the space affect what can be retained and what must be replaced.
Commercial Fit Out
Commercial fit out converts a building shell or existing premises into usable business accommodation. Internal partitions, building services, fire safety arrangements and finishes must suit the intended occupation.
Commercial Groundworks
Commercial groundworks are the site preparation and below-ground construction for a building or development. The work can include excavation, foundations, drainage and external hardstanding. Mistakes here are costly to correct.
Commercial Structural Alterations
Commercial structural alterations can involve new openings, removing loadbearing walls, strengthening floors or modifying an existing frame. The original structure must be investigated and assessed by a competent structural engineer before loadbearing changes are made.
Commercial Design and Build
Under a design and build contract, one contractor takes contractual responsibility for both design and construction, subject to the agreed terms. The contractor may develop an initial design or take responsibility for completing a design already partly prepared.
Planning a building project
Many projects involve more than one of the services above, and we cover them all. The commercial project planner is a simple way to put early budget figures alongside an outline of the work.

Plan your project
Commercial Project Planner
Indicative commercial building costs
Request a quote
Complete the form and we will get back to you.